Loft conversion by installing a new roof structure to create more loft space.
Location
North West London
Area
75 sqm
Timeline
6 months
Year
2020
Location
North West London
Area
75 sqm
Timeline
6 months
Year
2020
The client’s brief was to have a new loft conversion. The proposal was to remove the existing roof structure and install a structure that can provide a structurally adequate loft space. To achieve this structural design, we introduced new steel beams within the loft floor with timber joists. The new roof structure was constructed out of timber. Choosing to use these materials for this new construction made the construction process speedy for the appointed contractor whilst achieving a structural design that was feasible for the client.